4. Hull construction
4.1. Designing the dewatering of an autopilot
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
4.2. Design of wall-hanging wall, stairs, portholes
.
.
.
.
.
.
.
.
.
.
.
.
.
.
4.3. EROSION: High-erosion erosion, gully ~ 60 mm rainfall
.
.
.
.
.
.
.
.
.
.
4.4. DN 4.80 / 3.50 m bladed channel design of main jig-piece
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.